

Further, cracking of the concrete was not observed at any location. The test results indicate that the behaviour of the FPPC girder under service load conditions is elastic. Meanwhile, the ultimate load in a monotonic manner was applied only on the left exterior and middle span as a four-point loading scheme. Service load in a monotonic manner was applied on the right exterior span (two-point), middle span (two-point), and on the left exterior span and middle span (four-point). Both service and ultimate loads were applied as two-point loadings.

The FPPC girder was tested under different loading conditions (such as service and ultimate loading conditions). The FPPC girder was constructed at the casting yard of Sino-Thai Engineering and Construction Public Company Limited (STECON), Thailand. The newly proposed FPPC girder is mainly comprised of three reinforced concrete (RC) hollow haunched girders, four piers or supports, two pier segments, four wet joints, and four bearings at each support. The salient features of the newly proposed girder system include lightweight, low-cost, easy and fast construction. The investigated FPPC girder represents the actual size, design and construction details for a newly designed monorail transit system (Yellow Line and Pink Line Monorail) in Bangkok, Thailand.

This study presented the results of an experimental program conducted on a newly proposed Full-scale Precast Post-tensioned Continuous (FPPC) girder for straddle monorail.
